Time | Thursday: 3:30 PM - 4:50 PM (Classroom Lectures) Tuesday: 2:00 PM - 3:15 PM (Entrepreneurship Lectures) Thursday: 2:00 PM - 4:50 PM (Laboratory) |
Place |
Lecture: 100 Simrall (Auditorium) Entrepreneurship Lectures: 100 Simrall (Auditorium) Meetings: Simrall 206 Labs: Simrall 323 (other rooms by appointment) |
Instructor |
Joseph Picone Office: 413 Simrall Office Hours: 8-9 TR (others by appt.) Email: picone@cavs.msstate.edu Phone: 662-325-3149 / Fax: 662-325-2298 |
Teaching Assistants |
Way Beng Koay (MS Project, Hardware) Office: 302 Simrall Office Hours: 3:30 PM to 5 PM TWR (others by appt.) Email: wk4@ece.msstate.edu Phone: 662-325-8111 / 662-325-2099 Jon Hamaker (Design Document, Software Eng.) Office: 429 Simrall Office Hours: 8 AM to 9 AM RF (others by appt.) Email: hamaker@cavs.msstate.edu Phone: 662-325-8335 |
Design Consultant |
Bill Buchanan (Hardware Design) Office: 246 Simrall (across from department office) Office Hours: 2 PM to 4 PM TR (others by appt.) Email: buchanan@ece.msstate.edu Phone: 662-325-2048 / Fax: 662-325-2298 |
Class Alias | ece_4512@cavs.msstate.edu |
URL | http://www.cavs.msstate.ed./publications/courses/ece_4512 |
Textbook Resources |
D.C. Hanselman and B.L. Littlefield, Mastering MATLAB: A
Comprehensive Tutorial and Reference, 1/e,, Prentice-Hall,
1996, pp. 542, ISBN: 0-13-191594-0.
P. Horowitz and W. Hill, The Art of Electronics, 2nd Edition, Cambridge University Press, 1994, ISBN: 0-521-37095-7. R. Schinzinger and M.W. Martin, Introduction to Engineering Ethics, McGraw-Hill, 2000, ISBN 0-07-233959-4. K.A. Smith, Project Management and Teamwork, McGraw-Hill, 2000, ISBN 0-07-12296-2. G. Voland, Engineering By Design, Addison-Wesley, 1999, ISBN 0-20-14985-10. |
Prerequisite |
Credit or registration in an ECE technical elective;
approval of a project proposal by your advisor.
(Note that these will change soon. You are strongly advised
to have completed most of your junior-level required
coursework, including Electronics II, Micro I, and Signals
and Systems.)
You must also be a member of a team that has a project registered in the Project Proposal database. |
Standard: | |
Weekly Deliverables | 25% |
Design Document | 15% |
Preliminary Design Review | 15% |
Design Review | 15% |
Hardware Prototype | 10% |
Web Site | 10% |
Advisor Evaluation | 10% |
Extra Credit: | |
Guest Lecture Attendance | 10% |
Peer Review | 10% |
|
|
|
Topic(s) |
|
|
|
Organization and Introductions |
|
|
|
The Design Cycle / MS Project Overview |
|
01/23 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 1 Design Constraints |
|
01/30 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 2 Software Engineering - Part I |
|
02/06 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 3 Software Engineering - Part II |
|
|
|
Project Meetings |
|
02/20 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 4 Software Engineering - Part III |
|
|
|
Preliminary Design Review |
|
03/06 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 5 Software Engineering - Part IV |
|
03/20 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 6 Software Engineering - Part V |
|
03/27 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 7 Teamwork |
|
04/03 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 8 Design Document |
|
|
|
Project Meetings |
|
04/17 |
3:30 - 4:00 PM |
Entrepreneurship Lecture No. 9 Open Discussion |
|
|
|
Design Reviews |
|
|
|
Project Deliverables |
|
|
Item(s) |
|
|
proposal database entry. |
|
|
revised proposal database entry; product specification. |
|
|
revised proposal database entry; revised product specfication MS Project document. |
|
|
MS Project document (update); problem statement; web site (first draft); |
|
|
MS Project document (update); design constraints (first draft). |
|
|
MS Project document (update); software interface design (physical model). |
|
|
MS Project document (update); software interface design (use cases). |
|
|
MS Project document (update); revised design constraints; information model. |
|
|
MS Project document (update); test specifications. |
|
|
MS Project document (update); executive summary. |
|
|
MS Project document (update); software process model; revised test specifications. |
|
|
MS Project document (update); revised Executive Summary. |
|
|
MS Project document (update); design document checkpoint. |
|
|
MS Project document (update); web site checkpoint. |
|
|
MS Project document (update). |